Canning Town Business Park

Goya have successfully redeveloped the old former 1940’s industrial site with a 114,000 sq ft, 12 unit industrial and trade counter scheme. Over 1300 piles down to 14 metres in the construction with several former foundations found insitu. The park includes:

  • gated entrance to estate
  • 8m estate totem pole at entrance
  • dedicated parking
  • concrete loading yards
  • electric roller shutter doors
  • all mains services

The project was shortlisted in the category of vertical cladding/rainscreen, in the 2014 Roofing Awards and is located within one mile of the Olympic Stadium.

Project Location